If the plat complies with the regulations, approval is mandatory


Real estate developers (remember them?) sometimes feel as though they’ve been pulled through a knothole backwards by the time they get a proposed subdivision plat to the stage at which it can be submitted to the local government for approval. According to several Missouri appellate opinions, if a proposed plat complies with the subdivision regulations, the local government has no choice but to approve it.

But reality is different, as shown by Alexander & Lindsey v. Platte County, an opinion issued last week by the Court of Appeals for the Western District of Missouri. The court reversed the trial court’s refusal to order that the Platte County Commission approve Alexander & Lindsey’s preliminary subdivision plat. But the appellate court noted that the county government would have additional opportunities to coerce Alexander & Lindsey into making more concessions if it attempted to go beyond the preliminary plat to the submittal of a final plat.

“Preliminary plats” are not mentioned in Missouri’s statutes that authorize counties to adopt and administer subdivision regulations. But the two-stage plat approval process is valuable for developers and planning and zoning boards. The preliminary plat approval process is often the means of obtaining approval for an entire project to be constructed in phases. Once the preliminary plat is approved, the developer can proceed with some confidence that final plats of each phase of the project will be approved when submitted. The preliminary plat approval process, sometimes done in conjunction with a rezoning application, introduces the proposed project to the public and the scrutiny of neighbors and a variety of government agencies.

During the preliminary plat approval process, the developer learns that the subdivision regulations, as written, do not represent the full scope of requirements. Often the government’s preferences for stormwater control, traffic signals, intersection improvements and other expensive issues are not expressed in the regulations. The preliminary plat application doesn’t seem to move forward, until the developer has agreed to install infrastructure that is beyond the requirements of the regulations.

When Alexander & Lindsey submitted a preliminary plat for a commercial subdivision with five lots ranging in size from 2 to 4.6 acres. Alexander & Lindsey completed a traffic study and a drainage study, which were approved by the county’s engineer and the Missouri Department of Transportation (MODOT).  The Platte County planning and zoning director found that it complied with the county regulations and recommended that the P&Z board approve it.

When the preliminary plat hearing took place before the P&Z board, several persons expressed concerns. Expressing “concerns” are a common manner of objecting to a project for reasons that are not based on regulations. A public water supply district represented that it could supply drinking water, but not in adequate volume or pressure for fire-suppression. An alderman from the nearby town of Weston was concerned that the project’s building setback line was only 75 feet, rather than 100 feet, as required by Weston’s ordinance; Weston had previously rejected the developer’s annexation petition. MODOT’s engineer stated that MODOT regulations did not require the elimination of a driveway, as suggested by a P&Z board member.

Even though the proposed preliminary plat fully complied with all regulations, the P&Z board voted it down. The developer appealed to the Platte County Commission, which was not bound to follow the P&Z board’s recommendation. The Commission upheld the P&Z board’s denial, citing four reasons:

  • lack of specification of proposed uses
  • lack of water for fire suppression and lack of sewer facilities
  • potential impact of possible sewer lagoons on neighboring properties and the public
  • potential for traffic hazards from the existence two driveways

The appellate court noted that these four objections were outside the scope of the county’s subdivision regulations. Therefore, the county’s refusal to deny the preliminary plat was arbitrary, and the trial court was instructed to order the Commission to approve the preliminary plat.

Advertisement

About Harry Styron

I'm a lawyer and mediator who lives in Branson, Missouri, whose professional interests involve real estate, nonprofits, and local government. As of 2022, I'm shrinking my legal practice so that I have more time to mediate real estate disputes. I'm happy to mediate using video platforms like Zoom and WebEx, or in person anywhere in Missouri.

4 responses »

  1. Harry, nice job. Thanks for reminding us about the usefulness of the preliminary plat as well as the rule of law that requires plat approval if all conditions of the ordinance have been met.

    Howard Wright

    Reply
  2. This was very interesting and informative.

    Reply
  3. Perhaps you should send copies of this decision to the local boards in Stone and Taney County, both of which suffer from the same problem – just because it meets the codes and regulations does not mean it will be approved.

    Reply
    • Unless planning and zoning board members are well-trained, they tend to want to accomplish zoning objectives (land use controls) through the denial of plats, which Missouri courts have said is impermissible.

      Subdivision regulations to be applied in determining whether a plat is acceptable are usually tailored to each zoning classification, so zoning should not be a consideration in evaluating a proposed plat.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: